-40%
1977 BN Burlington Northern Railroad employee timetable #21 - Billings Region
$ 4.62
- Description
- Size Guide
Description
The Chicago, Burlington & Quincy Railroad (CBQ), also known as the Burlington Route, was a major US railroad, serving 12 states in the Mid-west and Southwest. In 1970 it merged with the Northern Pacific, the Great Northern, and the Spokane, Portland, & Seattle railroads to form Burlington Northern (BN). For auction is "Employee Timetable #21" from the BN for the Billings Region; it is dated September 8, 1977. The timetable lists all stations and scheduled trains for the Montana Division (all 12 Sub-Divisions); the Yellowstone Division (all 13 Sub-Divisions); and the Rocky Mountain Division (all 19 Sub-Divisions). Also listed are industrial tracks and other tracks not shown as stations in the timetable and scheduled freight trains.1977 BN Burlington Northern Railroad employee timetable #21 - Billings Region
1977 BN Burlington Northern Railroad employee timetable #21 - Billings Region
Click images to enlarge
Description
The
Chicago, Burlington & Quincy Railroad
(CBQ), also known as the
Burlington Route,
was a major US railroad,
serving 12 states in the Mid-west and Southwest
(Colorado, Illinois, Iowa, Kentucky, Missouri, Montana, Nebraska, New Mexico, South Dakota, Texas, Wisconsin, Wyoming). In 1970 it
merged with the Northern Pacific, the Great Northern, and the Spokane, Portland, & Seattle railroads to form
Burlington Northern (BN)
. After subsequent mergers/acquisitions, to include the
Santa Fe
, the original
Burlington
Route
trackage is now operated primarily as the BNSF Railroad
.
For auction is "Employee Timetable #21" from the BN for the Billings Region
; it is
dated September 8, 1977.
The timetable
lists all stations and scheduled trains
for the Montana Division (all 12 Sub-Divisions); the Yellowstone Division (all 13 Sub-Divisions); and the Rocky Mountain Division (all 19 Sub-Divisions). Also listed are industrial tracks and other tracks not shown as stations in the timetable and scheduled freight trains. Please note that Mountain Standard Time is shown in black, and both Central Standard Time and Pacific Standard Time are in red. There is also a speed table and speeds for performing switching.
The timetable measures appx 9 3/4 x 4 1/2 inches folded, 9 3/4 x 9 inches opened, contains
28 pages
, and is printed on mid-weight paperstock. It is in
very good condition
, with no rips or tears, and the binding is secure with all pages firmly in place.
A nice item for the Burlington railfan.
Images sell!
Get Supersized Images & Free Image Hosting
Create your brand with Auctiva's
Customizable Templates.
Attention Sellers - Get Templates
Image Hosting, Scheduling at Auctiva.com.
Track Page Views With
Auctiva's FREE Counter